Dr Rahul Kumar Jaiswal

Scientist 'F' OIC (Maintenance), OIC (Vehicle), Hindi Officer,

Central India Hydrology, NIH RC Bhopal WALMI Campus Bhopal

rkjaiswal.nih@gmail.com 09425655193

About

Having More than 30 years of research experience in Hydrological studies, modeling, climate change, flood mapping, dam break, EAP, etc.

Academic Qualifications

DegreeSubjectUniversityYear
PhD Climate Change study Maulana Azad National Institute of Technology, Bhopal 2018
M Tech Hydrology IIT Roorkee 2001
Bechlor of Engineering Cilvil Engineering APS University Rewa 1990

Experience

Administrative Roles

Research Interest

Publications

Projects

Sponsored Projects 6

Development of Decision Tool for Efficient Utilization of Water Resource in Parbati Canal Project of Rajasthan
Agency: World Bank funded National Hydrology Project | Duration: 2018-2021 | Role: PI
Hydrological Modeling for Evaluation ofReturn Flow and Irrigation Planning for Optimal Utilization of Water Resource in the Command of Sanjay Sagar Project in Madhya Pradesh
Agency: World Bank funded National Hydrology Project | Duration: 2018-2021 | Role: PI
Integrated Reservoir Operation Study for Mahanadi Reservoir Project Complex in Chhattisgarh
Agency: World Bank funded National Hydrology Project | Duration: 2019-2022 | Role: PI
Rainfall-Runoff Modelling of Banganga, Gambhiri, Parbati, Sabi, Shekhawati Basins Based on LULC Patterns
Agency: World Bank funded National Hydrology Project | Duration: 2019-2022 | Role: Co-PI
Evaluation of Impact of Rabi Irrigation inGanga River Sub-Basin of Madhya Pradesh
Agency: World Bank funded National Hydrology Project | Duration: 2018-2021 | Role: Co-PI
Study of Reservoir Sedimentation, impactAssessment and Development of Catchment Area Treatment Plan for Kodar Reservoir in Chhattisgarh State
Agency: World Bank funded Hydrology Project-II | Duration: 2009-2013 | Role: PI

Consultancy Projects 28

Preparation of Emergency Action Plan for 6 dams of MP
Agency: WRD MP | Duration: 18 Months | Role: Co-PI
Verification of Hydrologic and Hydraulic Model for Sabarmati Riverfront Development (Phase II)
Agency: Sabarmati River Front Development, Ahmedabad | Duration: 03 Months | Role: PI
Dam break Flood Simulation, Preparation of Inundation Map, Flood Analysis and Preparation of Emergency Action Plan for Vasna Barrage
Agency: WRD Gujarat | Duration: 06 | Role: Co-PI
Hydrogeological Study for Proposed Cement Plant & Mining Lease of Jaykaycem (Central) Ltd. In Panna District (M.P.)
Agency: J K Cem (Pvt} Ltd | Duration: 06 Months | Role: PI
Vetting of Hydrology of Chinki & Boras Barrage
Agency: Water Resource Deptt, Govt. of MP | Duration: 03 Months | Role: PI
Vetting of Hydrology of Jhirmiti Barrage Project in Burhanpur District
Agency: Water Resource Deptt, Govt. of MP | Duration: 01 Months | Role: PI
Vetting of Hydrology of Nawatha Barrage
Agency: Water Resource Deptt, Govt. of MP | Duration: 03 Months | Role: PI
Preparation of Working Table of Multiple Reservoirs of Bina Complex
Agency: Water Resource Deptt, Govt. of MP | Duration: 02 Months | Role: Co-PI
Flood Plain Zoning for Narmada River in Madhya
Agency: Narmada Valley Development Agency | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Kosarteda Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Shyam Ghunghutta Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Maniyari Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Minimata Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Tandula Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Ravishankar Sagar Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Maniyari Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Kanhargaon Dam
Agency: Water Resource Deptt, Govt. of UP | Duration: 18 Months | Role: PI
Vetting of Hydrology and Hydraulic Study for Watr Development of Sabarmati River Banks with Waterbody from Indira Bridge to Chiloda Bridge for SRFDCL
Agency: M/S Advance Engineering Consultant, Ahmedabad | Duration: 03 Months | Role: PI
Vetting of Design Flood & Environmental Flow for Sitapur Hanumana Barrage
Agency: Peritus Advisors Contractors & Engineers, Bhopal | Duration: 03 Months | Role: PI
Vetting of Hydrology and Hydraulic Study for the work of Riverfront Development at Khanwel
Agency: Dadar and Nagar Haveli Planning and Development Authority, Silvasa | Duration: 03 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Gosikhrd Dam, Bhandara (Maharashtra)
Agency: Water Resource Deptt, Govt. of Maharashtra | Duration: 18-Months | Role: PI
Vetting and Assessment of Climate Change of Water Availability in Kalpsar Project
Agency: Kalpsar Deptt, WRD, Gujarat | Duration: 18 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Proposed Kotha Barrage
Agency: Project Administrator, Kotha Barrage Project Kotha Barrage Project Implementation Unit Ganj Basoda, Vidisha (M.P.) | Duration: 12 Months | Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Suthana Dam
Agency: Madhya Pradesh Power Generation Company Ltd, Chachai, Distt. Anuppur | Duration: 12 Months | Role: PI
Assessment of Design Flood for Construction of Barrage on Betwa River
Agency: BPCL, Bina | Duration: 06 Months | Role: PI
Dam break Flood Analysis andPreparation of Emergency Action Plan forUkai Dam, Kadana Dam, Dharoi Dam, Shetrunji Dam, Hiran Dam, and Machhundri Dam from WRD Govt. ofGujarat
Agency: WRD Gujarat | Duration: 2021-Present | Role: Co-PI
Verification of Hydrology and Hydraulic Study for Proposed Barrage cum Bridge between Torrent Power and Camp Sadar Bajar for the Sabarmati River Front Development Project (SRFDCL, Ahmedabad
Agency: Sabarmati River Front Development, Ahmedabad | Duration: 06 Months | Role: PI
Preparation of Emergency Action Plan for 3 dams of MP
Agency: WRD MP | Duration: 18 Months | Role: PI

Conference & Training

Training / Workshop / Brainstorming

Rainfall-Runoff Modelling using HECHMS during July 19-23 2021
National Duration: 5 Days Location: Online
Hydrodynamic Modelling Using HEC-RAS during Aug 23-27 2021 under NHP
National Duration: 5 Days Location: Online
Hydrological Modeling Using Soil and Water Analysis Tool (SWAT): Theory and Hands-On during July 27-31 2021
National Duration: 5 Days Location: Online
Rainfall-runoff Modelling for Water Resource Management during Dec 08-11 2021
National Duration: 5 Days Location: Raipur (CG)
Flood Forecasting Modeling using HEC-RTS during July 05-16 2021 under NHP
National Duration: 12 Days Location: Online
Hydrologic Modelling using HEC-HMS and HEC-RAS during Oct 19- 23 2020 under NHP
National Duration: 5 Days Location: Online
Hydrologic Modelling using HEC-HMS and HEC-RAS during Oct 19- 23 2020 under NHP
National Duration: 5 Days Location: Online
River Basin Modelling during Jan 25-29,2021 under NHP
National Duration: 5 Days Location: Bhopal
QGIS and its application for Surface and Groundwater Hydrology during Feb 22-26, 2021
National Duration: 5 Days Location: Jaipur
Hydrological Modeling using HEC-RAS and HEC-HMS during Oct 09-11 2019 at Bhopal under NHP
National Duration: 3 Days Location: Bhopal
"Advance Hydrology” during Jan 06-10 2020 at Jaipur under NHP
National Duration: 5 Days Location: Jaipur
River Basin Modelling during Jan 07-11, 2019 at Jaipur under NHP
National Duration: 5 Days Location: Jaipur
River Basin Modelling during Jan 15-19,2018 at Bhopal (MP)
National Duration: 5 Days Location: Bhopal
Training/Workshop on the Preparation of EAP of Earthen Dams at Raipur from Jan 21 to 24, 2026.
National Duration: 5 Days Location: Raipur
5-day Training/Workshop on the Preparation of EAP June 02-06 2025 at Nagpur
National Duration: 5 Days Location: Nagpur
5-day Training/Workshop on the Preparation of EAP of Earthen Dams under NHP during Sep 24 to 28 2024
National Duration: 5 Days Location: Raipur

Achievements

Honors & Awards

Professional Memberships

Student Guidance

Doctoral Supervision
Development of Optimal Water Resources Utilization Plan Under Climate Change for Parbati Reservoir
Student: Abhishek Agarwal | University/Institute: Maharana Pratap University Udaipur | Year: 2023 | Role: Co-Guide
Irrigation water requirements under climate change and development of mitigation strategies for the future
Student: Ms Pushpanjali Kumari | University/Institute: Jharkhand Central University Ranchi | Year: 2026 | Role: Co-Guide
Studies on Climate Change Pattern for Ravishankar Sagar Reservoir Using Mike Hydro Basin Model
Student: Ms Gunja Dhruvw | University/Institute: IGKV Raipur | Year: 2025 | Role: Co-Guide

Miscellaneous

National / International Committees

Foreign Visits