Projects
Development of Decision Tool for Efficient Utilization of Water Resource in Parbati Canal Project of Rajasthan
Agency: World Bank funded National Hydrology Project
|
Duration: 2018-2021
|
Role: PI
Hydrological Modeling for Evaluation ofReturn Flow and Irrigation Planning for Optimal Utilization of Water Resource in the Command of Sanjay Sagar Project in Madhya Pradesh
Agency: World Bank funded National Hydrology Project
|
Duration: 2018-2021
|
Role: PI
Integrated Reservoir Operation Study for Mahanadi Reservoir Project Complex in Chhattisgarh
Agency: World Bank funded National Hydrology Project
|
Duration: 2019-2022
|
Role: PI
Rainfall-Runoff Modelling of Banganga, Gambhiri, Parbati, Sabi, Shekhawati Basins Based on LULC Patterns
Agency: World Bank funded National Hydrology Project
|
Duration: 2019-2022
|
Role: Co-PI
Evaluation of Impact of Rabi Irrigation inGanga River Sub-Basin of Madhya Pradesh
Agency: World Bank funded National Hydrology Project
|
Duration: 2018-2021
|
Role: Co-PI
Study of Reservoir Sedimentation, impactAssessment and Development of Catchment Area Treatment Plan for Kodar Reservoir in Chhattisgarh State
Agency: World Bank funded Hydrology Project-II
|
Duration: 2009-2013
|
Role: PI
Consultancy Projects
28
Preparation of Emergency Action Plan for 6 dams of MP
Agency: WRD MP
|
Duration: 18 Months
|
Role: Co-PI
Verification of Hydrologic and Hydraulic Model for Sabarmati Riverfront Development (Phase II)
Agency: Sabarmati River Front Development, Ahmedabad
|
Duration: 03 Months
|
Role: PI
Dam break Flood Simulation, Preparation of Inundation Map, Flood Analysis and Preparation of Emergency Action Plan for Vasna Barrage
Agency: WRD Gujarat
|
Duration: 06
|
Role: Co-PI
Hydrogeological Study for Proposed Cement Plant & Mining Lease of Jaykaycem (Central) Ltd. In Panna District (M.P.)
Agency: J K Cem (Pvt} Ltd
|
Duration: 06 Months
|
Role: PI
Vetting of Hydrology of Chinki & Boras Barrage
Agency: Water Resource Deptt, Govt. of MP
|
Duration: 03 Months
|
Role: PI
Vetting of Hydrology of Jhirmiti Barrage Project in Burhanpur District
Agency: Water Resource Deptt, Govt. of MP
|
Duration: 01 Months
|
Role: PI
Vetting of Hydrology of Nawatha Barrage
Agency: Water Resource Deptt, Govt. of MP
|
Duration: 03 Months
|
Role: PI
Preparation of Working Table of Multiple Reservoirs of Bina Complex
Agency: Water Resource Deptt, Govt. of MP
|
Duration: 02 Months
|
Role: Co-PI
Flood Plain Zoning for Narmada River in Madhya
Agency: Narmada Valley Development Agency
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Kosarteda Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Shyam Ghunghutta Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Maniyari Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Minimata Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Tandula Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Ravishankar Sagar Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Maniyari Dam
Agency: Water Resource Deptt, Govt. of Chhattisgarh
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Kanhargaon Dam
Agency: Water Resource Deptt, Govt. of UP
|
Duration: 18 Months
|
Role: PI
Vetting of Hydrology and Hydraulic Study for Watr Development of Sabarmati River Banks with Waterbody from Indira Bridge to Chiloda Bridge for SRFDCL
Agency: M/S Advance Engineering Consultant, Ahmedabad
|
Duration: 03 Months
|
Role: PI
Vetting of Design Flood & Environmental Flow for Sitapur Hanumana Barrage
Agency: Peritus Advisors Contractors & Engineers, Bhopal
|
Duration: 03 Months
|
Role: PI
Vetting of Hydrology and Hydraulic Study for the work of Riverfront Development at Khanwel
Agency: Dadar and Nagar Haveli Planning and Development Authority, Silvasa
|
Duration: 03 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Gosikhrd Dam, Bhandara (Maharashtra)
Agency: Water Resource Deptt, Govt. of Maharashtra
|
Duration: 18-Months
|
Role: PI
Vetting and Assessment of Climate Change of Water Availability in Kalpsar Project
Agency: Kalpsar Deptt, WRD, Gujarat
|
Duration: 18 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Proposed Kotha Barrage
Agency: Project Administrator, Kotha Barrage Project Kotha Barrage Project Implementation Unit Ganj Basoda, Vidisha (M.P.)
|
Duration: 12 Months
|
Role: PI
Dam Break Analysis and Preparation of Emergency Action Plan for Suthana Dam
Agency: Madhya Pradesh Power Generation Company Ltd, Chachai, Distt. Anuppur
|
Duration: 12 Months
|
Role: PI
Assessment of Design Flood for Construction of Barrage on Betwa River
Agency: BPCL, Bina
|
Duration: 06 Months
|
Role: PI
Dam break Flood Analysis andPreparation of Emergency Action Plan forUkai Dam, Kadana Dam, Dharoi Dam, Shetrunji Dam, Hiran Dam, and Machhundri Dam from WRD Govt. ofGujarat
Agency: WRD Gujarat
|
Duration: 2021-Present
|
Role: Co-PI
Verification of Hydrology and Hydraulic Study for Proposed Barrage cum Bridge between Torrent Power and Camp Sadar Bajar for the Sabarmati River Front Development Project (SRFDCL, Ahmedabad
Agency: Sabarmati River Front Development, Ahmedabad
|
Duration: 06 Months
|
Role: PI
Preparation of Emergency Action Plan for 3 dams of MP
Agency: WRD MP
|
Duration: 18 Months
|
Role: PI
Conference & Training
Training / Workshop / Brainstorming
Rainfall-Runoff Modelling using HECHMS during July 19-23 2021
National
Duration: 5 Days
Location: Online
Hydrodynamic Modelling Using HEC-RAS during Aug 23-27 2021 under NHP
National
Duration: 5 Days
Location: Online
Hydrological Modeling Using Soil and Water Analysis Tool (SWAT): Theory and Hands-On during July 27-31 2021
National
Duration: 5 Days
Location: Online
Rainfall-runoff Modelling for Water Resource Management during Dec 08-11 2021
National
Duration: 5 Days
Location: Raipur (CG)
Flood Forecasting Modeling using HEC-RTS during July 05-16 2021 under NHP
National
Duration: 12 Days
Location: Online
Hydrologic Modelling using HEC-HMS and HEC-RAS during Oct 19- 23 2020 under NHP
National
Duration: 5 Days
Location: Online
Hydrologic Modelling using HEC-HMS and HEC-RAS during Oct 19- 23 2020 under NHP
National
Duration: 5 Days
Location: Online
River Basin Modelling during Jan 25-29,2021 under NHP
National
Duration: 5 Days
Location: Bhopal
QGIS and its application for Surface and Groundwater Hydrology during Feb 22-26, 2021
National
Duration: 5 Days
Location: Jaipur
Hydrological Modeling using HEC-RAS and HEC-HMS during Oct 09-11 2019 at Bhopal under NHP
National
Duration: 3 Days
Location: Bhopal
"Advance Hydrology” during Jan 06-10 2020 at Jaipur under NHP
National
Duration: 5 Days
Location: Jaipur
River Basin Modelling during Jan 07-11, 2019 at Jaipur under NHP
National
Duration: 5 Days
Location: Jaipur
River Basin Modelling during Jan 15-19,2018 at Bhopal (MP)
National
Duration: 5 Days
Location: Bhopal
Training/Workshop on the Preparation of EAP of Earthen Dams at Raipur from Jan 21 to 24, 2026.
National
Duration: 5 Days
Location: Raipur
5-day Training/Workshop on the Preparation of EAP June 02-06 2025 at Nagpur
National
Duration: 5 Days
Location: Nagpur
5-day Training/Workshop on the Preparation of EAP of Earthen Dams under NHP during Sep 24 to 28 2024
National
Duration: 5 Days
Location: Raipur